Skip to Content
How to build a 4 to 1 haul system. Remember that in "even" numbered systems (e.
![]()
How to build a 4 to 1 haul system It requires less rope than a (non-piggybacked) 2:1 system, is reasonably easy to rig, is easy to add a progress capture device, provides an appropriate amount of mechanical advantage to raise one or two people, and with a few tweaks it can be converted into a simple 5:1 system . Scott Backes, representing Petzl Work and Rescue, came A simple 6:1 has a lot of pulleys, but this illustration is worthwhile as an education tool. The items then needed to build the system are quite simple and include the following: about 75-100 feet of good haul rope, about 12 feet of smaller diameter cordage (5-10mm is good) to be cut in two for making "Prusiks" (see below), a rope or webbing loop/sling for encircling the anchor point, and two strong carabiners (suitable for climbing). Simple 4:1 System. The 4:1 system can be rigged as either a simple or compound system. Basic In-Line 3:1 Haul System Anchor, Anchor Strap, Carabineers, Rigging Plate, LRH, Prusiks, Prusik Minding Pulleys Apr 29, 2010 · The 4:1 block and tackle system can easily be converted to a 5:1 by simply flipping the system around. 5:1 System. Jan 11, 2022 · This video shows how to set up a 3:1 and 5:1 haul system for climbing and also explains the physics behind the systems. Notice in a 4:1 Jul 31, 2019 · This pulley system provides a 4:1 mechanical advantage. For field applications where minimum gear is available, carabineers can replace pulleys and the anchor plate can be eliminated. Remember that in "even" numbered systems (e. e. The second two illustrations show how you can convert 3:1 systems to 5:1 systems. "Piggy-backing" or adding a 2 to 1 mecha 3:1 System The 3:1 is the classic mechanical advantage system used by rescuers. Because the simple 4:1 requires four strands of rope to go from the anchor to the load, it is usually rigged as a piggyback unless the load is May 9, 2025 · And that’s your system. g. Here, Scott builds a 4:1 Haul System using Petzl Pulleys and a Micro Traxion Progress Capture Pulley. This video demonstrates how to build a 4 to 1 block and tackle mechanical advantage haul system for rope rescue operations from 2 different viewing perspecti Simple 4:1 System. A simple 4:1 system is built by starting at the anchor and threading the rope through pulleys on the load, the anchor, and back to the load. This can be used for single pitch an Ever wondered how rescuers haul victims up a cliff face? Here I will show you mechanical advantage systems that get the job done. It's one long rope threaded multiple times. The user is required to apply a force of 25kg to raise this 100kg load, for every 4 metres of rope that the user pulls through the pulley system the load will only be raised by 1 metre. This video demonstrates how to build a traditional 4 to 1 mechanical advantage haul system for rope rescue operations. , the 1:1, 2:1, and 3:1) are all simple systems. The first two illustrations on this page show how to rig both varieties. com A typical example of a 3-to-1 raising system using the proper equipment is shown in Figure 1-2. Five-to-one mechanical advantage systems can be rigged as either simple or complex systems. The 4:1 can be attached to the mainline so that the hauler(s) are pulling towards or away from the anchor. It’s fast to build, easy to reset, and provides a reliable baseline for more advanced mirrored or twin-tensioned systems if needed. Aug 10, 2022 · Setting Up the Split 4:1 Raise System. Steps to Build the Split 4:1 Raise System: Dead-End the Rope Attach the rope to the tripod head or AHD (Artificial High Directional). This is handy if you rig a 3:1 and don't quite have enough pulling power. The Split 4:1 system involves creating a 4:1 mechanical advantage using single pulleys, with the flexibility to split it into two independent 2:1 systems as needed. Pulley Setup Sep 15, 2020 · This video demonstrates how to build a traditional or simple 4 to 1 mechanical advantage haul system as well as a compound 4 to 1 mechanical advantage haul s About Press Copyright Contact us Creators Advertise Developers Terms Privacy Policy & Safety How YouTube works Test new features NFL Sunday Ticket Press Copyright The systems we've seen thus far (i. You will see using the T-Method that there are 5 units of tension on one end of the 4:1 and 4 units . This setup gives you the power of a 4:1 haul—enough to raise a load smoothly with a two- or three-person team—and the prusik gives you control. To better explain, take a look at Figure 6 you and you will see a 4:1 MAS. , 2:1, 4:1, 6:1, etc) the end of the rope is connected to the anchor, as shown in this 6:1 system. ” See full list on cmcpro. This haul system will be used in a ho This video demonstrates how to build a compound 4 to 1 mechanical advantage haul system for rope rescue operations. The piggyback system can be an AZTEK, as illustrated in this video; a pre-rigged 4:1, such as a CSR pulley system; or built from scratch. esap nfxso memkr ryorxe jszd gtsf jsvtx hicke demlszi drpucc